Disaster!
The armature I was building for the top half of the UWS piece has turned out to be a failure. The material wasn’t up to the weight demands, and sagged to the point it wasn’t viable.
So, with 3 weeks to go, one of which will have 4 days going to New Zealand and back, I’ve got to find another solution. I’m thinking it’s going to be stainless steel pipe, cut with lots of slots, then bent and welded. back together.
I’ve priced a small welder that’ll run off domestic house power, and which should do the job. So in the 2 days before I go away, I’ve got to get stainless steel organised, get a welder organised and gear up for a new and expensive addition to my practice.
Argh.